thumb

      Head Office in New-York

      Request a Quote

      * Please Fill Required Fields *
      img

      Toll Free

      1-800-987-6543

      Working Hours

      We are happy to meet you during our working hours. Please make an appointment.

      • Monday - Friday:9am to 5pm
      • Saturday:10am to 3pm
      • Sunday:Closed
        thumb

        Head Office in New-York

        Request a Quote

        * Please Fill Required Fields *
        img

        Toll Free

        1-800-987-6543

        Working Hours

        We are happy to meet you during our working hours. Please make an appointment.

        • Monday - Friday:9am to 5pm
        • Saturday:10am to 3pm
        • Sunday:Closed

        Completed Projects

        Marcegaglia S.p.A.

        Gazoldo degli Ippoliti (MN) Plant
        • Regular and extraordinary maintenance
        • Prefabrication and installation of piping for rolling oil and cooling water distribution circuits, valve and electric pump installation
        • Prefabrication and installation of 2″ to 6″ pipes
        • Supply, prefabrication, and installation of PP/PPH/PVDF pipes for stainless steel pickling line service fluids
        • Overhauling crane runway paths
        Contino – Volta Mantovana (MN) Plant
        • Regular and extraordinary maintenance
        • Various mechanical maintenance
        Casalmaggiore (CR) Plant
        • Regular and extraordinary maintenance
        • Overhauling crane runway paths
        • Crane runway path replacement
        Ravenna (RA) Plant
        • Regular and extraordinary maintenance
        • Supply/prefabrication of new utility pipelines
        • Supply, on-site assembly, and reconstruction of acid storage facility piping sections
        • Construction and installation of column runway support
        • Panel hut wall cutting and subsequent restoration
          Assembly of pipe bridges for new sheds 6-7
          Installation of crane buffers
        Boltiere (BG) Plant
        • Supply and assembly of BEMA3 silent cover
        • Supply and assembly of S275 tank measuring 9000 x 1250 x H.1550 mm
        • Supply and assembly of DS. 30347-01 collection tank
        • Regular and extraordinary maintenance
        Pozzolo Formigaro (AL) Plant
        • Construction and assembly of PANPF04 substation mezzanine
        • Construction and assembly of metalwork
        Rivoli (TO) Plant
        • Construction and assembly of metalwork
        • Mechanical maintenance

        Marcegaglia S.p.A.

        Kluckbork – Ligota Dolna (Poland) Plant
        • Construction work for foundations of CTL FIMI 870 and FIMI 871 lines, road and parking lot construction, drainage channels, earthworks, asphalt, and external electrical installation

        GRUPPO Mauro SAVIOLA

        Stustinente (MN) Plant
        • Regular and extraordinary maintenance
        • Various mechanical maintenance
        Viadana (MN) Plant
        • Construction and assembly of metal structures
        • Construction and assembly of plant and pipelines

        Gruppo PITTINI - ACCIAIERIE di VERONA

        Acciaierie di Verona
        • Regular and extraordinary maintenance
        • Prefabrication and installation of piping for rolling oil and cooling water distribution circuits, valve and electric pump installation
        • Prefabrication and installation of 2″ to 6″ pipes
        • Overhauling crane runway paths
        • Crane runway path refurbishment
        Ferriere Nord – Osoppo (UD)
        • Supply and assembly of customized metal structures

        GENERAL ELECTRIC Italia S.p.A.

        Centrale di Ponti S/M
        • Methane skid replacement
        Centrale di Tavazzano
        • DLN 2.6 Upgrade;
        Centrale di Cassano d’Adda
        • DLN 2.6 Upgrade;

        COMECA S.p.A.

        GRUPPO MAURO SAVIOLA di Stustinente (MN) Plant
        • Assembly of new boiler PEE cyclones
        Acciaieria di Terni
        • Welding work on 2 tanks

        BERTOLI Costruzioni S.p.A.

        • Strengthening of Verallia glassworks trusses in Dego (SV)
        • Supply of reinforced Beltrame steel mill pillars

        AFV Acciaierie Beltrame S.p.A.

        • Installation of high-pressure hydraulic lines
        • Installation of a casting tower by Comeca

        Gruppo Feralpi Siderurgica

        • In-line welder assembly

        Acciaieria ARVEDI S.p.A.

        • VDC inspection and control
        • Supply and installation of VDC for Line 1
        • Supply and installation of oven 1 staircase
        • Reconstruction of EAF 2 pump room roof
        • Supply and installation of L 2 flag crane

        ARVEDI Tubi Acciaio

        • Regular and extraordinary maintenance
        • Various mechanical maintenance
        • Supply and installation of service lines for ELTI furnace

        ILMED Impianti

        • Construction of preassembled closed circuit towers
        • Tower assembly on-site
        • Cooling tower revamping